Everyday Play

Case Study

Harbour Primary School

Harbour Primary Logo

Location

East Sussex

Completed

2025

A little about this project

Harbour Primary school in East Sussex, got in touch with us here at Everyday Play to see if we could quote to add play equipment installed in their back playground, incorporating a bank which joins onto the playground. Our playground design team jumped on it and came up with this design that fitted a 4 tower bespoke castle perfectly into the bank, perfect for making the most of the space available. Included in the build was a large angled climbing wall, 1.2m Platform Height, Slide, Firemans Pole, Angled Rock & Rope Climb, Angled Connecting Bridges and a scramble net.

Everyday Play Arrow - Fun Arrow Pointing

Testimonials